Products

Brochure PDF's

Technical

Technical Bollards

Sockets

General Notes

Foundation Note:
Prepare hole at least 75mm deeper than overall height of the socket and fill below with hard-core or gravel to allow for drainage. Place the socket in the centre of the hole, ensuring that there is good clearance on all sides, and hold in vertical position. Pour concrete and compact well and check that socket is vertical until it has set. NOTE: If existing ground is loose or uncompacted a wide / deeper base of concrete should be used.

Optional Shear Bolts:
Furnitubes can provide bollards that are attached onto a lower spigot using nylon ‘shear bolts’ to enable the fire brigade to knock it over with little or no damage during an emergency. The sockets enable the spigot to be removed and re-used with new nylon bolts.

Product Codes
Product Codes are in bold type. Dimensions are in mm, are approximate and do not form any part of the contract. We reserve the right to change the design and specification on any item offered and, where possible, notification will be made.

Small F1 Socket Large F1 Socket

F1 75
Composite removable socket.
Cast iron lid.
Cast aluminium key.

To accept bollards of 75mm diameter

F1 115
Composite removable socket.
Cast iron lid.

To accept bollards of 115mm diameter

Back to top